Introduction

By following the following steps, you will be able to prepare the machine for production, start-up the process to conduct production trials or experiments, and shut down the process when finished.

Image 1/1:
  • Follow these steps to prepare and operate the Engel eMotion 440/110 injection molding machine.

Add Comment

Image 1/1:
  • Turn on the main power by rotating the main disconnect lever to the "on" position.

Add Comment

Image 1/1:
  • Turn on machine power by rotating the lever to the "on" position.

Add Comment

Image 1/1:
  • Turn on power to the control by rotating the "Control Voltage" button clockwise.

Add Comment

Image 1/1:
  • Turn on main water supply, ball valve on the floor, near injection end of machine.

Add Comment

Image 1/1:
  • Turn on water supply at the manifold by rotating the lever on the ball valve - clamp end of the machine.

Add Comment

Image 1/2: Image 2/2:
  • Turn on Cylinder Heating - rotate switch clockwise. The lamp will glow when turned on. Check set points and actual temperatures by depressing the heats icon in the upper portion of the control panel.

Add Comment

Image 1/1:
  • Turn on "Motor" by rotating the button clockwise and releasing it. There may be a delay of a few seconds before the lamp glows. CAUTION: Do not attempt to move or rotate the screw until the cylinder heats have reached the appropriate set point and have been allowed to stabilize for 15-20 minutes.

Add Comment

Image 1/1:
  • Check the position of the nozzle to make sure it is not in contact with the mold during the warm-up period.

Add Comment

Image 1/2: Image 2/2:
  • Push the "Heats" button on the control panel to observe the actual cylinder temperatures as compared to the set points. Allow a minimum of 30 minutes for temperatures to stabilize at the set point prior to performing any movement to the screw.

Add Comment

Image 1/1:
  • Select "Semi-Automatic" operating mode by depressing the button on the control panel.

Add Comment

Image 1/2: 1. Ensure that heats are at set points and have stabilized for at least 15 minutes Image 2/2: 2. Check shot size to ensure that it is not set extremely high or low.
  • Check machine conditions:

  • 1. Ensure that heats are at set points and have stabilized for at least 15 minutes

  • 2. Check shot size to ensure that it is not set extremely high or low.

  • Check the switchover position to ensure that it is set at a position well away from forward, approximately at 1 to 1.5 inches, depending on shot size.

  • Check to ensure that hold pressure and time are either turned off or at low settings.

  • These things are done to prevent flashing or over filling of the mold. This is when damage is likely to occur if too much material is injected into the mold too fast or with excessive pressure.

Add Comment

Image 1/1:
  • Depress the green "Start" button to initiate cycling of the machine.

Add Comment

Finish Line